60
Scored questions listed by DBPR's Examinations at a Glance for the General Contractor Project Management examination.
Prepare for the General Contractor Project Management examination with focused practice across construction methods, materials, tools and equipment, safety, and reading plans and specifications.
Start Your 72-Hour Free TrialFor Division I General, Building, and Residential contractors, DBPR identifies Project Management as one of the three examination parts, alongside Business & Finance and Contract Administration. DBPR states that construction examinations are open book and consist of multiple-choice questions. Its current examination information directs candidates to the applicable Project Management content outline and approved reference list. citeturn0search0turn0search6
Scored questions listed by DBPR's Examinations at a Glance for the General Contractor Project Management examination.
Time listed by DBPR for the General Contractor Project Management examination.
Construction examinations are multiple choice and open book under DBPR's current examination guidance.
DBPR's Examinations at a Glance identifies 60 scored questions and 4.5 hours for Project Management. citeturn0search0
The published General Contractors Project Management Examination Content Information organizes the exam into three major content areas: Construction Methods, Materials, Tools and Equipment; Safety; and Reading Plans and Specifications. The published weighting is 63% for Construction Methods, Materials, Tools and Equipment, 20% for Safety, and 17% for Reading Plans and Specifications. citeturn0search22
Practice construction methods and materials across concrete, masonry, wood and metal framing, innovative techniques, energy-efficient construction, finishes, roofing, and heavy equipment.
Study OSHA standards and other safety practices covering site layout, soil, shoring, scaffolding, trenches, equipment, fall protection, and hazardous materials.
Build skill reading drawings, sections and views, symbols, tables, specifications, shop drawings, submittals, codes, standards, and ADA requirements.
The published content information includes topics such as concrete construction, masonry, wood framing, metal framing, innovative construction techniques, energy efficiency, miscellaneous materials, and heavy equipment. It also addresses material properties, installation methods, bracing, connections, coatings, insulation, roof coverings, cranes, hoisting equipment, and lift plans. citeturn0search22
Because this is the largest published content area, a useful preparation strategy is to organize practice by concept rather than treating Project Management as one undifferentiated question bank.
The published safety area includes OSHA compliance topics such as site layout, soil conditions, shoring, bracing, earthwork, formwork, framing, scaffolding, trench safety, ground-fault interruption, construction equipment, fall protection, and job-site safety information. It also includes asbestos, lead paint, hazardous waste disposal, and mold remediation. citeturn0search22
The plans-and-specifications area includes reading construction documents, basic calculations associated with drawings, architectural and engineering symbols, tables and specifications, shop drawings and submittals, and interpreting codes and standards including building codes and ADA requirements. citeturn0search22
DBPR strongly encourages candidates to bring approved reference materials and states that no other references are allowed at the examination site. The current reference-list page identifies the approved construction examination references and effective dates. citeturn0search0
Prepare not only by learning construction concepts, but also by becoming familiar with the approved references you expect to use during the examination.
Review the ATHENA Florida CGC Reference Books GuideSource note: Current DBPR examination information was checked September 24, 2026. The detailed General Contractor Project Management content document currently published by DBPR is dated January 2020; its content areas and published weightings are presented as that source states them, not as a claim that the document itself was newly revised. citeturn0search22turn0search0
Build Project Management preparation inside the same ATHENA learning experience used for Business & Finance and Contract Administration.
Start Your 72-Hour Free Trial